Customization: | Available |
---|---|
Material: | Steel Structure |
Surface Treatment: | Hot DIP Galvanized, Painted |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification and Introduction | ||||||
steel structure | Q235 or Q345 just for triangle roof | |||||
Floor | Concret foundation with C-steel connect with anchoring bolt | |||||
Exterior wall panel | Both sides 0.4mm steel plates, 50mm thickness EPS color steel composite sandwich panel without fireproof material | |||||
Interior wall panel (partition ) | Both sides 0.3mm steel plates, 50mm thickness EPS color steel composite sandwich panel without fireproof material | |||||
Roof | 0.3mm/0.4mm color steel plates, 75mm thickness EPS color steel composite sandwich panel with waterproof material without fireproof. | |||||
Door | Aluminum alloy Door/1pcs or 2 pcs | |||||
Window | Aluminum alloy window/2 pcs or 4pcs | |||||
Connection fittings | Screw, ridge, Sealant, Brace and so on(Aluminum alloy) | |||||
Technical parameter | Roof load: 50kg/square metre Wind resistant: 10 Grade Fire protection: B1 grade Earthquake resistance: 8 Grade-10grade | |||||
Package | In bulk with steel plate for easy instaling | |||||
Delivery time | within 10-20days after receiving the first deposit | |||||
Capacity | over 500units per month | |||||
Per week | normal 80-100 units | |||||
How many people | About 4-12peoples depands on the different CBM and different residence | |||||
Install time | 11 workers work for 2 unit per days | |||||
CBM | Please choose the pictures that you like and make the measurment firm | |||||
Remark | 1. If custom request, we will send our engineer to your country for guiding the installation, the custom will pay the engineer all fee(airplane, visa, Lodging and the Wages ) in your country. | |||||
2. Consider the exchange rate and the material price, The quotation period of validity is 15 days. | ||||||
3. The quotation do not include electrcity and draining, decoration, and include the wall panel, roof panel, window and door. | ||||||
4. The quotation do not include foundation, decorateion, sanitary equipment. | ||||||
5. The quotation do not include installation tool |